@Rodwhite Thanks you @
meldrewreborn and @
retrotecchie for the feedback.
Before posting this I contacted EON Next Customer services on 08085015200 and spoke to energy specialist Kayleigh.
I purposely did not call the number on the letter from EON Next ( 0808 501 5266) which stated that " Your meter has reached the end of its life ..." My thinking here was that the guys on this number were there primarily to book customers smart meter installation and not necessarily the best to discuss this issue.
Anyway, Kayleigh said.
- They only replace existing meter with a smart meter.
- When the replacement is booked they put a note on the installation request that a 3 phase meter installer is to be used and that a 3 phase E10 meter should be installed.
- I advised that the meter I have now was installed by EON in 2015 so only 8 years old and that the same meter is available on line where it says the operational lifetime is 10 years, so why replace now. Kayleigh said the meter needs to be replaced in January 2024.
I stated that when I was in contact with EOn Next by email in Sept I was advised that they currently "do not supply E10 smart meters but are working on it"
- I asked what make of smart meter should be installed but was told they could not advise as it would be down to the meter installer
I finished the call by saying I would contact this group and ask whether any EON Next customers have had a successful install of E10 in a 3 phase supply before deciding what to do.
I am looking for reassurance that any replacement with a smart meter has been done before. Hence this thread.
The question now is what should I do, help please ?
options
- Contact EON by email send details of existing meter and maybe a picture of the set up inside the box. ?
- Something else ?
- Contact another supplier, reluctant to do this as current meter was installed by EON.
- Do nothing.
Any suggestions would be appreciated.