So I am applying for the SEG until I come across a condition that states :
Please note - if you have a battery to store the electricity that you generate, you'll only be eligible for this tariff if your battery is only fed from your microgen installation. If your battery is powered from the grid, unfortunately you won't be eligible.
Whats the issue, well my system uses Micro Inverters so there is no DC other than that between the panel and its Micro Inverter.
My Battery is therefore an AC coupled battery as I have no option to have a DC coupled battery.
Surely having an AC coupled battery should not exclude you from SEG ?
@paulj If you have a SEG account already then that licensee would have confirmed or rejected the battery storage options, as in charging from the grid etc. We will check the application and complete the switch.
There shouldn't be an issue if you have had a SEG account for 2 years, however as previously advised we will need to check the switch application.
Have a solar related question? Pop me a tag! Need our customer service teams? Click here!📣 for ways to contact us
The whole point is to export excess energy generated from purely solar or other off-grid generation. Charging a battery off the grid at off-peak rates and exporting that same energy (known as brown energy) doesn't provide any net benefit to the grid and is therefore excluded from the scheme. But nothing to stop you charging the battery at night and using that power by day to supplement your solar generation or reduce your net import.
Don't shoot me, I'm only the piano player. I DON'T work for or on behalf of EON.Next, but am willing to try and help if I can. Not on mains gas, mobile network or mains drainage. House heated almost entirely by baby dragons.
@retrotecchie
Yep I get that I could charge overnight and then sell back at a profit, but I dont see why having AC coupled battery system should exclude you from SEG, lets face it even with a DC coupled battery it is possible to charge via the grid.
All battery systems can be charged from the grid as well as from solar. All battery systems allow you to use your stored energy from whatever source as part of your energy requirements. But AC coupled systems and microinverters are not able to be metered for net import and net export, which is how the SEG system works.
My solar system is completely and totally isolated from my grid supply. What I generate I use and then when I run out of power I draw from the grid (a system known as grid fallback). There is no way to make that comply with the requirements for SEG. But I mitigate my costs by using all my own available energy, so I'm not losing out.
@retrotecchie, Everything generated by my MI system is metered to the panel level Everything exported and imported is metered, the only grey area would be that as previously mentioned I could charge overnight and sell back to the grid at a profit, but ite ridiculous to do so and then have to import at day rates it doesnt make sense to do it.
So I still see no valid reason to not allow an AC coupled system to export.
Sorry to hear that @paulj have you spoken with the team about it?
I'm afraid there is an eligibility requirement but there is no harm in enquiring this with the team that could provide a little more information😊👍
We have more info on our website here hope this helps 🌈
As with every diverse community, there is always a mixture of opinions, knowledge as well as understanding - that’s what makes it such a great place to be! To make sure everyone gets the most out of our Community and feels good doing it, we’ve created some values below on how to be an awesome, positive member. So, take a read and then go for it!
We love having you all here in the Community and really hope you find some great advice and help from our other amazing members. As a community team, our main role here is keeping things ticking over, everyone safe and getting involved in some great conversations! We know many of you will have specific queries about your accounts and we want to keep your personal details safe so please don't post them here.
• Saying thanks goes a long way
• The community is a public website, so be careful
• Be kind, respectful and supportive
• It's a family-friendly community
• If you’re in a specific section or discussion, try to stay on topic
• One post is normally enough
• Be cool, don’t spam
We want to ensure that the community is safe and fair for everyone…
We all work hard to ensure everyone feels respected and supported while using the community, and keep that positive energy flowing. If a member or group is disrupting your experience without a genuine reason, you can report this to the community team quickly and easily by clicking the 3 dots on the post. Don’t worry about a thing, we’ll take it from there. If you get a message from the team about your behaviour, please try to work with us, as all we want to do is make this a positive place for everyone. In order to this, we have to uphold these Community Values and the Community Team has the final say.
The full Community Values can be viewed here
If you agree, please click the 'I agree' checkbox and press the 'Complete Registration' button below. If you would like to cancel the registration, click here to return to the Community homepage.
Although the administrators and moderators of E.ON Next Community will attempt to keep all objectionable messages off this site, it is impossible for us to review all messages. All messages express the views of the author, and neither the owners of E.ON Next Community, nor vBulletin Solutions Inc. (developers of vBulletin) will be held responsible for the content of any message.
By agreeing to these rules, you warrant that you will not post any messages that are obscene, vulgar,sexually-oriented, hateful, threatening, or otherwise violative of any laws.
The owners of E.ON Next Community reserve the right to remove, edit, move or close any content item for any reason.