Afternoon @
Woodlands
This is from the current T&Cs for the Drive Tariff.
Terms for our Next Drive tariff (from 4 December 2024).
Testing your smart meter.
4.1 As part of switching to this tariff, If you’re switching to us from another supplier we must run test-reads of your smart meter for up to 15 days.
4.2 During this period, you will be on our Standard Variable Tariff (SVT), Next Flex.
4.3 If the tests are successful, your tariff begins when the tests have completed.
4.4 If the tests are unsuccessful, you will remain our SVT, and we will contact you with options, for example, to switch back to your previous supplier, choose another supplier, continue on the SVT or choose one of our other products. On the SVT, your unit rate is the same all day (there would not be a lower off-peak unit rate(s) and time(s)).
4.5 If you are already an E.ON Next Customer, we must run test-reads of your smart meter for up to 5 days and you will remain on your existing tariff during this period.
4.6 If the tests are successful, your tariff begins when the tests have completed.
4.7 If the tests are unsuccessful, you will remain on your current tariff.
4.8 We reserve the right to withdraw this tariff at any point.
https://www.eonnext.com/policies/terms-and-conditions