I have read with interest about SMART meters and the option of making it DUMB.
I have an old digital display Economy SEVEN meter and send readings via on line (with router wifi turned off) at the end of each month.
When the broadband supplier left the wifi turned on (by accident) the effect of the wifi caused me severe pain and memory problems.
I have brain damage due to a car accident and a sustained head injury.
I am on the special register and wonder if a categorical answer and assurance can be given that if the present digital read out Economy Seven meter must be replaced that the replacement meter is a SMART meter that can and will be placed in DUMB mode ??