The IHD (Chameleon 3) has always displayed waiting for data.
WAN and HAN light flash once every 5 secs
After repeated calls to the supplier and no resolution, (unable even to get an engineer visit) we were resigned to it being a dumb meter. Fast forward some years and we're now EON customers and looking to install a solar array c/w battery bank.
Question 1 - If we do this would our meter track the feed into the grid from our solar, or would we be supplying to grid for no benefit to ourselves?
Question 2 - Any thoughts on the comms issue? I seem to be looking at a 3 month queue to speak to anyone dealing with Smart meters / comms and am wondering if the comms hub is cellular or LRR (phone signal (EE) is mid strength by the meter), looking at best options - new hub, new meter / hub unit with mesh option, ariel.